This high-profile university project demanded a fast-tracked, 14-month schedule with double shifts. Air Design worked closely with the design team to develop mechanical systems that were both efficient and accessible for long-term use.
The entire mechanical room was laid out by our team to better serve the owner and building engineers. The project was frequently featured in the media due to its size and visibility.
Completed on schedule despite the demanding timeline
Delivered fully coordinated, accessible systems that met university standards
Maintained strong collaboration with project stakeholders throughout construction